Space & Ductwork

Wall Openings

  • Two 6" x 12" wall openings are installed on opposite sides of the cellar to generate effective cross-flow:
  • Supply Air: High on the wall
  • Return Air: Low on the wall

Mechanical Room Access

  • Adequate space nearby to house the cooling unit
  • Ventilation in the room is sufficient to dissipate heat

Ductwork Requirements

  • Ducts (e.g., 8" supply and 8" return) are planned with:
  • Maximum of 25 feet per duct (50 feet total combined)
  • Smooth, gradual bends (avoid sharp turns)
  • Ducts will be insulated to prevent condensation and minimize noise
2

Electrical & Drainage

Dedicated Electrical Circuit

  • A dedicated circuit is available for the unit:
  • Typically 115V/20A (or 120V/15A, based on your specific unit requirements)
  • No GFCI outlet is used

Drain Access

  • A drain is located within 15 inches of the unit, or a condensate pump is planned if farther away
  • Ensure proper drain line installation with a slight slope and no blockages
3

Cellar Construction & Insulation

Insulation Standards

  • Walls: Minimum R20 insulation
  • Ceiling: R20–R30 insulation
  • Floor: Minimum R20 insulation (if the cellar isn't in a basement)

Vapor Barrier

  • A vapor barrier is installed on the warm side of the walls/ceiling

Floor & Door Considerations

  • There are no heated floors, or a 12-inch gap is maintained if present
  • The cellar door has proper seals; note that glass doors may need additional insulation
4

Ambient Conditions

Mechanical Room Temperature

  • The room housing the unit maintains an ambient temperature between 50°F and 77°F (10°C to 25°C)

Humidity Control

  • The cellar area is not prone to high humidity, reducing the risk of mold and system strain
5

Installation Preparation

Unit Handling

  • The cooling unit must be kept in an upright position, with the compressor at the bottom, for at least 24 hours before installation